Installation
Preventative Maintenance
Operation
1. Mix coating material to manufacturers
instructions.
2. Turn needle adjusting screw (18)
clockwise to prevent movement.
3. Turn spreader valve (10) counter-
clockwise to fully open.
4. Adjust inlet air pressure (For
recommended figures see
Specifications) at the gun inlet with the
gun triggered. (pressure gauge
attachment shown under Accessories is
recommended for this).
5. Turn needle adjusting screw counter
clockwise until first thread shows.
6. Test spray. If the finish is too dry reduce
airflow by reducing air inlet pressure or
by the Airflow Valve (22). Screw the
Adjusting Knob in to reduce pressure.
7. If finish is too wet reduce fluid flow by
turning needle screw (18) clockwise or
reducing the fluid pressure. If
atomisation is too coarse, increase inlet
air pressure. If too fine reduce inlet
pressure.
8. The pattern size can be reduced by
turning adjusting valve (10) clockwise.
9. Hold gun perpendicular to surface being
sprayed. Arcing or tilting may result in
uneven coating.
10. The recommended spray distance is
150-200 mm (6”-8”).
11. Spray edges first. Overlap each stroke a
minimum of 50%. Move gun at a
constant speed.
12. Always turn off air and fluid supply and
relieve pressure when gun is not in use.
1. Turn off air and coating supply and
relieve pressure in the supply lines, or
if using QD system, disconnect from
airline and fluid line.
2. Remove air cap (1) & (2) and clean. If
any of the holes in the cap are blocked
with coating material use a toothpick to
clean. Never use metal wire which
could damage the cap and produce
distorted spray patterns.
3. Ensure the tip of the nozzle (3) is clean
and free from damage. Build up of
dried paint can distort the spray
pattern.
4. Lubrication – stud (24), needle (16) and
air valve (13) should be oiled each day.
Important: To ensure that this equipment
reaches you in first class condition,
protective coatings have been used. Flush
the equipment through with a suitable
solvent before use.
1. Attach air hose to connector (19).
Recommended hose size 8 mm bore.
The hose must be conductive and
electrical bond from the spraygun to
earth should be checked with an
ohmeter. A resistance of less than 10
6
Ohms is recommended.
2. Attach fluid supply hose to Fluid Inlet
(28).
E
E